The Fadette Junction Utility Transmission project in Alabama was completed in 2020.
Sentry Electrical Group teams installed concrete monopoles for one mile of 115 kV transmission line, consisting of extra high strength (EHS) static and optical ground wire (OPGW) fiber optic cable with 795 Drake aluminum conductor steel reinforced (ACSR).
Sentry Electrical Group provided utility transmission work on PowerSouth’s Fadette Junction project.