The Orange Beach Utility Transmission project in Alabama was completed by PowerSouth in 2020.
Sentry teams installed concrete monopoles for two miles of 115 kV transmission line, consisting of extra high strength (EHS) static and optical ground wire (OPGW) fiber optic cable with 795 Drake aluminum conductor steel reinforced (ACSR).
Sentry Electrical Group provided utility transmission work on PowerSouth’s Orange Beach project like the work pictured here.