Prevailing Wind in South Dakota
Prevailing Wind in South Dakota
Sentry Electrical worked with Consulting Engineers Group (CEG) on their Prevailing Wind substation project, which is located in Lesterville, South Dakota.
Sentry provided 230/115kV substation interconnect with 230 kV line voltage to the 90 MW wind farm.
Sentry teams provided substation construction expertise – such as installation of components similar to those pictured here – for CEG’s Prevailing Wind site.